Live DOC-to-CPM

Turn project documents into risk-adjusted construction schedules.

Strat.AI is AI construction scheduling software for general contractors and construction managers. It reads drawings, specs, RFIs, and schedule data to generate auditable CPM schedules with critical path, dependencies, and live delay risk.

0 File types parsed
0 Schedule accuracy
0 Avg. generation
FIG-01 · AI-driven document pipeline LIVE
01 · INPUT 02 · LLM 03 · GRAPH 04 · SCHEDULE DWG-07 SPEC-02 RFI-18 PARSE EXTRACT CLASSIFY LINK GRAPH CPM A-04 Foundation A-06 Steel A-09 Envelope A-13 Finishes A-15 Turnover DOCS INGESTED 1,248 +14% CRITICAL PATH 486d -11d LIVE · ITERATION 214 · resequencing MEP
Core Platform

Built like the engineering work it replaces — precise, auditable, and accountable.

01 Ingest

Every document, parsed.

Upload drawings, specs, schedules, RFIs, submittals. Strat.AI extracts activities, quantities, dependencies, and constraints — automatically.

142 File types
~41s Avg parse
02 Generate

CPM schedules in 90 seconds.

A full critical-path schedule with logic ties, calendars, crew assignments, and resource leveling. Editable, auditable, exportable to P6 and MS Project.

<90s To draft
94% Accuracy
03 Adapt

Risk that updates itself.

Weather, supplier lead-times, and jobsite reports feed back into your schedule. Delay risk is scored daily, per activity, with the exact reason why.

24/7 Risk scoring
5 Live integrations
04 Verify · NEW

Catch $500K in missed scope before the first shovel hits the ground.

Strat.AI cross-references every subcontract scope item against the drawing package — line item by line item, sheet by sheet — to surface scope gaps, scope creep, quantity mismatches, spec conflicts, and change-order risks. Every finding lands with a dollar-impact estimate, the exact contract reference and drawing reference, and a recommended action you can take this week.

5 Discrepancy categories
$500K+ Typical exposure caught
<60s Per contract
How it works

From the first PDF to a defensible schedule — without the 3-week planner backlog.

I ~1 min

Upload your plan set

Drag in the drawing set, specifications, and any RFIs or submittals you already have.

II ~40 sec

AI extracts the graph

Activities, durations, crews, quantities, and hard logic are pulled from the documents.

III ~60 sec

Verify scope vs drawings

Drop in the subcontract — Strat.AI flags missing scope, scope creep, quantity mismatches, and change-order risks before they hit the field.

IV ~10 min

Review the schedule

Edit activities, adjust calendars, lock critical paths. Every change is version-controlled.

V Ongoing

Go live — forever

Weather, supplier, and field feeds update risk daily. Export to P6, MSP, or share view-only links.

Most construction schedules age the moment they're saved. Strat.AI re-runs the critical path every time the field changes — so the plan you ship matches the plan you build.
SA
The Strat.AI team
Construction operators, building the tool we always wanted

Schedule like it's already built.

For most GCs, a single avoided delay pays for the platform. Talk to sales to scope your deployment.